This project at the Scalloway Boating Club included designing, supplying, and installing new commercial kitchen. GR Contracting were also asked to bring the existing 1970s electrical distribution up to current standards. Electrical works included, rewiring the kitchen, new RCBO protection to circuits and new energy-efficient LED lighting installed in the kitchen. An EICR electrical report was also issued for the building to confirm the electrical installation is safe and meets the required standard.

“We asked GR to quote for a new kitchen and some electrical works. Lewis came right away to measure up and we had prices in no time. He liased with the heating company to arrange the timing to work in and kept us up to date all through the project. We would recommend GR to anyone looking to do a similar project and will be in touch for future work at the Scalloway Boating Club.”

- Cynthia Poleson - Treasurer